Advanced Electrical
Year:2009
Duration:4 months
Website:www.advanced.net.au
The new warehouse was designed by the client and is constructed from concrete tilt panels and was fitted out with new offices and toilets to meet the client’s needs.
Year:2009
Duration:4 months
Website:www.advanced.net.au
The new warehouse was designed by the client and is constructed from concrete tilt panels and was fitted out with new offices and toilets to meet the client’s needs.